User Tools

Site Tools


post-launch-checklist

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
post-launch-checklist [2008/11/12 13:22]
uri_ba added links to OPS2
post-launch-checklist [2008/11/12 18:53] (current)
uri_ba
Line 20: Line 20:
 ^  48  |  Mission Dep.  |  Right AFT Panel  |  R11L \\ \\ \\ \\ R13L  | * Confirm MAJOR FUNC Is Set To SM \\ * Enter [[ops2#​ops2021|OPS 202 PRO]] (AFT Keypad) \\ * Enter ITEM 3 EXEC \\ * Enter ITEM 1 EXEC \\ * Set PL BAY DOOR (SYS 1 & SYS 2) To ENABLE \\ * Set PL BAY DOOR To OPEN \\ * Confirm PL BAY DOOR Talkbacks Show DEP | Open Payload Doors \\ PL BAY DOOR SPEC Display \\ Enable Auto Mode \\ Enable AC Power \\ \\ Opening Both PL Doors Takes 3 Minutes \\ Indicating Both PL Doors Are Open  | ^  48  |  Mission Dep.  |  Right AFT Panel  |  R11L \\ \\ \\ \\ R13L  | * Confirm MAJOR FUNC Is Set To SM \\ * Enter [[ops2#​ops2021|OPS 202 PRO]] (AFT Keypad) \\ * Enter ITEM 3 EXEC \\ * Enter ITEM 1 EXEC \\ * Set PL BAY DOOR (SYS 1 & SYS 2) To ENABLE \\ * Set PL BAY DOOR To OPEN \\ * Confirm PL BAY DOOR Talkbacks Show DEP | Open Payload Doors \\ PL BAY DOOR SPEC Display \\ Enable Auto Mode \\ Enable AC Power \\ \\ Opening Both PL Doors Takes 3 Minutes \\ Indicating Both PL Doors Are Open  |
 ^  49  |  Mission Dep.  |  Right Aft  |  R13L  | * Set PL BAY MECH PWR (SYS 1 & SYS 2) To ON  \\ * Set RADIATOR LATCH (SYS A & SYS B) To RELEASE ​ \\ * Check RADIATOR LATCH SYS Talkbacks Indicate REL  \\ * Set RADIATOR CONTROL (SYS A & SYS B) To DEPLOY \\ * Check RADIATOR CONTROL SYS Talkbacks Indicate DEP  | Deploy Radiators \\ Indicating That The Radiators Are Ready For DEP. \\ Deploying Both Radiators Takes 30 Seconds. \\ Indicating Both Radiators Are Deployed. | ^  49  |  Mission Dep.  |  Right Aft  |  R13L  | * Set PL BAY MECH PWR (SYS 1 & SYS 2) To ON  \\ * Set RADIATOR LATCH (SYS A & SYS B) To RELEASE ​ \\ * Check RADIATOR LATCH SYS Talkbacks Indicate REL  \\ * Set RADIATOR CONTROL (SYS A & SYS B) To DEPLOY \\ * Check RADIATOR CONTROL SYS Talkbacks Indicate DEP  | Deploy Radiators \\ Indicating That The Radiators Are Ready For DEP. \\ Deploying Both Radiators Takes 30 Seconds. \\ Indicating Both Radiators Are Deployed. |
- 
 ^  50  |  Mission Dep.  |  Right Aft  |  R13L  \\ \\ \\ \\ \\ R11L  | * Set RADIATOR LATCH (SYS A & SYS B) To OFF \\ * Set RADIATOR CONTROL (SYS A & SYS B) To OFF \\ * Set PL BAY DOOR To STOP \\ * Set PL BAY MECH PWR (SYS 1 & SYS 2) To OFF \\ * Set PL BAY DOOR (SYS 1 & SYS 2) To DISABLE \\ * Enter ITEM 2 EXEC **(AFT Keypad)** ​ | Disable All Power To PL Doors And Radiators. \\ \\ \\ \\ \\ Disable AC Power To The Doors  | ^  50  |  Mission Dep.  |  Right Aft  |  R13L  \\ \\ \\ \\ \\ R11L  | * Set RADIATOR LATCH (SYS A & SYS B) To OFF \\ * Set RADIATOR CONTROL (SYS A & SYS B) To OFF \\ * Set PL BAY DOOR To STOP \\ * Set PL BAY MECH PWR (SYS 1 & SYS 2) To OFF \\ * Set PL BAY DOOR (SYS 1 & SYS 2) To DISABLE \\ * Enter ITEM 2 EXEC **(AFT Keypad)** ​ | Disable All Power To PL Doors And Radiators. \\ \\ \\ \\ \\ Disable AC Power To The Doors  |
 ^  51  |  Mission Dep.  |  Right Aft  |  R11U  | * Set FUEL CELL - PURGE HEATER To GPC \\ * Set H2O LINE HTR & H2O RELIEF HTR To A AUTO \\ * Confirm PURGE VALVES (1/2/3) Are On GPC \\ * Confirm STARTUP HEATER (1/2/3) Are Set To ENABLE \\ * Set GPC PURGE SEQ To START - Press START For 3 Seconds \\ * Confirm GPC PURGE SEQ START Talkback Is WHITE  | Initiate Fuel Cell Purge  | ^  51  |  Mission Dep.  |  Right Aft  |  R11U  | * Set FUEL CELL - PURGE HEATER To GPC \\ * Set H2O LINE HTR & H2O RELIEF HTR To A AUTO \\ * Confirm PURGE VALVES (1/2/3) Are On GPC \\ * Confirm STARTUP HEATER (1/2/3) Are Set To ENABLE \\ * Set GPC PURGE SEQ To START - Press START For 3 Seconds \\ * Confirm GPC PURGE SEQ START Talkback Is WHITE  | Initiate Fuel Cell Purge  |
post-launch-checklist.txt ยท Last modified: 2008/11/12 18:53 by uri_ba